Green future

Mumbai city’s oldest and largest landfill site is heading for a change of image. The BMC is planning to convert a part of the 127 hectares garbage dump into a green belt which will include a lawn and a walking track, gas wells to trap methane to generate electricity and two processing units to process 1,000 metric tonnes of refuse daily. The project is targeted at a cost of 5,500 crores and is expected to be completed by 2033.

Related posts

Clean India Show and Laundrex India 2025 to bring together 600+ brands championing sustainability and smart hygiene

Hyderabad Robots to Clear Waterlogging

Bengaluru Drowning in 5,000T of Textile Waste